This remodel job involved a major 2nd floor demo of all oak cabinetry, and the reconfiguration of the “his and hers” master baths, master bedroom, dressing area and huge walk-in closet. This included all new tile, marble, tub, cabinetry, mirrors and trim. In addition, the master bedroom received a new floor plan configuration and in the large entertainment/family room, a brand new entertainment complex was completed.

GORDON-LENT-CONSTRUCTION—Beverly-Hills-1-A

GORDON-LENT-CONSTRUCTION—Beverly-Hills-1-B

GORDON-LENT-CONSTRUCTION—Beverly-Hills-1-C

GORDON-LENT-CONSTRUCTION—Beverly-Hills-1-D